bid early looking opening project sometime
We are looking at opening that project for competitive bid sometime in early fall.
blessed mild sweeping winter
Traditionally we don't do sweeping in the winter months, but we've been blessed with a mild January.
learning
The SPUI ... I will acknowledge there will be a learning curve.
backup decision design direction eliminate exit increased longer slower storage
The SPUI design is much safer, because of longer exit ramps with increased storage that eliminate the backup on the freeway. And when you exit I-94 to Telegraph, with the SPUI design, the decision of which direction you want is made on the ramp, at a slower speed. Before, that decision was made on mainline I-94 itself.
anticipate dry putting salt
As long as you're not putting salt on a dry surface, it usually sticks. We anticipate the salt will be working fine.
bridge life reached
Essentially, this bridge has reached its life expectancy.
anticipate bridges extensive fully time traffic
They're pretty extensive repairs. I fully anticipate we should have those bridges reopened to traffic some time in October.
along alternate businesses cases continue happens hoping normally people projects road route seek telegraph trouble viable within work zone
The trouble with projects like Telegraph Road is, there is no viable alternate route. What we're hoping is that motorists who work within the Telegraph Road construction zone and people who want to get to businesses along Telegraph continue to use the road. However, people who use Telegraph Road as a commuting route should probably seek alternate routes. That's what normally happens in cases like this.