Dan Brucker

Dan Brucker
conductors dog easier found move pet
Our conductors found it much easier to move a dog or a pet when they're not in a crate.
charge per simply supposed took train
We are supposed to charge $4 per ride. But if a train arrived, we simply took them and got them on the train.
beacon flooding minor parking section station time volume water
While we have experienced minor flooding in that section of the Beacon station parking lot in the past, this is the first time we encountered a buildup and volume of water as we did on Jan. 18.
breaks exact failure others pull rate scramble short simply tight together
I can't give you exact numbers, but our failure rate (for locomotives) has risen. We are very tight on locomotives. We're short two, and the others are not only old but they're also being used more, and their reliability simply isn't 100 percent. So, when one breaks down, we really have to scramble and pull together with NJ Transit.
damage debris disruption entire length storm wind
Most storm damage is usually concentrated in one area, but with this wind storm, we had debris all over the entire length of the line. The damage and disruption was widespread.
arriving businesses cell earlier given growing hours necessity operate people work
More and more people are arriving to work earlier and earlier. Given the ever-growing use of cell phones, the Internet, and other communications options, many businesses operate 24 hours a day today. There is a growing necessity to get to work earlier.
asked central earlier grand positive trains
We asked commuters on trains that got to Grand Central before 7 a.m. if they had a choice, would they take an even earlier train, and we got a very positive response.
delays hits mechanical recover took trying
We're trying to recover from it. We took some hits from it, with some delays and some mechanical difficulties from the cold.
expect gear normal season storm tomorrow
It's the first storm of the season and we've got to gear up for it. We expect to have a normal commute tomorrow because we will be working all night.
analysis capital draft environmental frame impact next project pursuing rail step time
The next step (in pursuing a rail link) would be to do an alternatives analysis and a draft environmental impact statement. But we don't have a time frame for going forward, and we don't have the project in our capital budget.
changed responding
The world of commuting has changed and we are responding to it.
basically delayed morning trains
We're basically on time. This morning was anything but normal, with 60 trains delayed up to two hours.
certainly damage debris terms ton trees widespread wind
There is a ton of debris all over the place, downed trees all over. This is certainly one of the most widespread in terms of wind damage and debris all over our system.
interested room west
We are always interested in expanding. West of Hudson, there is still significant room for growth.